Start Saving Now More than £3,640,143 saved so far
Value for money - to us this means more than just competitive tendering. Adding value is about using expertise and creativity to save or to set a strategic path to deliver an outcome. This page is dedicated to Ringley hero’s who have saved their Clients' money.
Saved £0
Hertford Lock, Bow
How did we do it?
Saved from the fate of Court Appointed Manager. Ringley now sits as Chair to the Board and leads 11 owner Directors. Disputes resolved over car parking policy, sub-letting, applying the lease, noise disturbance and reserves. A new lease has also been drafted.
Saved £0
Trinity Close
How did we do it?
This 1930s mansion block was in a sorry state. Years of neglect meant left essential maintenance overdue and the building was grinding to a halt. Projects underway: electrics, lift, roof and garage refurbishments, a new porters station, letting of porters flat.
Saved £12,750
Alliance Close, Wembley
How did we do it?
The Housing Association did not want to be part of a voluntary UPVC window replacement project. But they did want the Management Company to redecorate their block. We bought a copy of their transfer and confirmed this to be their liabaility £12,750 saved.
Saved £1,654
Vanbern House
How did we do it?
It took us 4 years to get 75% of owners signed up to a S37 application to vary the lease to get rid of a defective insurance clause. Now the block can buy 1 insurance policy, saving £1,654pa for ever. Previously there were 11 policies and lots of arguments.
Saved £13,367
Trinity Close
How did we do it?
The porter was struggling to deliver the vision, the residents vote wanted change. We reviewed the roles and negotiated with the porter to live off site and marginally reduce his hours. Renting the flat will produce income desperately needed to help repair the roof.
Saved £8,719
William Perkin Court/Farthing Ct
How did we do it?
Pipes sunk into concrete floors (no longer permitted by building regulations) left us with an expensive insurance claim. Expert negotiation achieved a committment by the insurer to replace a whole pipe run to reduce future risks of more of the same!
Saved £5,800
Barton Mill
How did we do it?
Saved £5,800 by instructing an expert to confirm that roof materials did not comply with building regulations.
A risk that had to be taken after both Zurich and the developer said NO.
Saved £3,714
Northiam Mgmt
How did we do it?
We collected a premium for the intermediate landlord (our Client) of £3,714.
The previous Agent was not collecting this. Good for the enfranchisee. Bad for our Client who ends up with a duty to pay more ground rent than they collect.
Saved £12,000
128 Haverstock Hill
How did we do it?
Previously Freehold managed by Ringley we helped the leaseholders buy the Freehold after the Section 5 Notice timed out. We brokered a deal £12,000 cheaper than buying the Freehold through the enfranchisement route. The Client then switched to our support service saving more!
Saved £9,576
Andersens Wharf
How did we do it?
The previous Agent set up the water wrong. The block had paid commercial water rates since 2004. We clawed back 6 years cash - £9,576 and reduced the VAT rate to residential.
Naturally it took a fight with Thames Water and reference to the CCWater.
- ← Previous
- 1
- 2
- 3
- Next →